- 400 Business Park Drive
- Tyngsboro, MA 01879-1077
- Phone: (978) 649-3300
- Fax: (978) 649-3399
- E-mail: mail08@jenike.com
- © 2008 by Jenike & Johanson, Inc.
- All rights reserved.
|
|
Newsletters
The following Jenike & Johanson newsletters can be downloaded in PDF format. If you are unable to view and print PDF files, you can download Adobe Acrobat Reader, for free.
 |
Click here for information on how to obtain Adobe Acrobat Reader |
|
|
Date |
Article Topics |
File Size |
|
 |
Winter, 2006
|
| Solving Large Scale Iron Ore Handling Problems |
| Meet Alfredo del Campo, General Manager J&J Chile |
| Startup and Operating Problems and Solutions |
| Question and Answer: Can J&J effectively provide solutions to industries so varied as mining and pharmaceuticals? |
|
548 kb |
|
 |
Fall, 2005
|
| Canadian Oil Mining Provides a World-Class Bulk Solids Handling Challenge |
| Meet Jesus Chavez, Project / Structural Engineer |
| John Carson Recognized with Solids Handling Award |
| J&J Builds New Headquarters |
|
664 kb |
|
 |
Spring, 2005
|
| Solids Handling Issues in Thermal Drying |
| Meet Tom Baxter, Senior Project Engineer |
| Beyond Functional Design Engineering |
| Question and Answer: How do I Properly Size a Grizzly? |
|
664 kb |
|
 |
Fall, 2004
|
| Easy Handling of Fine Limestone at Relatively High Rates |
| Meet Scott Clement, Senior Project Engineer |
| J&J Expands Lab Capabilities with New Equipment |
| Question and Answer: Are the Design Parameters Provided by J&J Different than Indices? |
|
664 kb |
|
 |
Spring, 2004
|
| Engineered Solution for Cement Plant Coal Delivery Problem |
| New ASTM Standards for Segregation Testing |
| Meet Eric Maynard, Project Engineer |
| A System Assessment Can Improve Your Competitive Edge |
| Question and Answer: How can I prevent segregation of my pharmaceutical mix? |
|
384 kb |
|
 |
Fall, 2003
|
| New European Standard on Silo Loads Nearing Completion |
| New ASTM Standards for Segregation Testing |
| Meet Mike Rulff, Senior Project Engineer |
| Dr. Andrew Jenike, 1914-2003 |
| Question and Answer: How often should I inspect my silo, and what should I look for? |
|
488 kb |
|
 |
Spring, 2003
|
| Meeting the Challenges of Unusual Materials: The Light Stuff |
| Quantify Segregation Potential with Two New Testers |
| Meet Brian Pittenger, Senior Consultant |
| Question and Answer: Who do you recommend to provide the services described in your courses? |
|
484 kb |
|
 |
Fall, 2002 |
| Proper Chute Design is Often Overlooked as Unimportant |
| New Shear Tester and Improved Testing Capabilities |
| Meet Eric Bengtson, Laboratory Manager / Project Engineer |
| Question and Answer: What criteria should I consider in selecting a bulk solids handling consultant? |
|
532 kb |
|
 |
Spring, 2002 |
| Hot Lime Feed System Problems Solved at Paper Mill |
| NFPA Standards Reduce Solid Fuel Fire Hazards with Bunker Design Requirements |
| Meet Rod Hossfeld, Sr. Project Engineer |
| Question and Answer: Is a polished hopper wall surface really needed? |
|
484 kb |
|
 |
Fall, 2001 |
| Silo Failures: Why Do They Happen? |
| Ore Pass Design |
| Meet David Goodwill, President Jenike & Johanson, Ltd. |
| Question and Answer: Limiting discharge rate problem |
|
512 kb |
|
 |
Spring, 2001 |
| Case Study: Flash Furnace Redesign at BHP Copper |
| Patents Awarded for Converging/Diverging Bin and Removable BINSERT® |
| Meet Roger Barnum, Project Engineer |
| Question and Answer: Which flow properties tester will meet my needs? |
|
464 kb |
|
 |
Fall, 2000 |
| Case Study: Glass Quality Improved with Reduced Segregation |
| Handling Bulk Solids in a Fluidized Condition (Part 2) |
| Meet James Prescott, Sr. Project Engineer |
| Question and Answer: Silo buckling concerns |
|
488 kb |
|
 |
Spring, 2000 |
| Case Study: Engineering Solutions for FMC Wyoming Improve Quality and Reliability in Handling Trona Ore |
| Handling Bulk Solids in a Fluidized Condition (Part 2) |
| Project at Dow Chemical Receives Award |
| Meet Herman Purutyan, Sr. Project Engineer |
| Question and Answer: What is a mass flow feeder? |
|
452 kb |
|
 |
Fall, 1999 |
| Using Silos as Processing Vessels, with BP Amoco case study |
| Jenike-Schulze Ring Shear Tester |
| Meet Randall St. Pierre, Sr. Laboratory Technician |
| Question and Answer: Silo loading |
|
408 kb |
|
 |
Spring, 1999 |
| Case In Point: Improving Product Quality by Reducing Segregation in a Pharmaceutical Application |
| PharmaSok Filling System Eliminates Dusting |
| Meet Tom Troxel, Vice President |
| Question and Answer: Mass flow hopper angles |
|
412 kb |
|
 |
Fall, 1998 |
| Case in Point: Achieving High Flow Rates Plus High Density with Kaolin Clay |
| Meet Greg Petro, Sr. Structural / Project Engineer |
| Question and Answer: Flowability and angle of repose |
|
452 kb |
|
|